Spent some more time working on the inside, the galley this time. The original work surface was 18mm Ply covered in a yellow patterned formica. As I needed to replace the sink the old work surface was going to need to be replaced. I looked for 25mm work surface, but couldn't find anything suitable and normal work surface is too thick.
However, in B&Q they sell some cheap surface which is only 38mm thick and was ideal, its a nice granite colour so it will match the internal colours scheme.
You can see the large tiles I'm going to use for the splash back, they are a slate affect so everything will tie in nicely.
The layers of varnish are building up as is the paint in the rear cabin, its lifted my spirits a bit seeing her come together and I can keep warm in the rear cabin with the gas heater on.
No comments:
Post a Comment